Adjusting the Thermal overload on Seepex WAS pumps

Adjusting the Thermal overload on Seepex WAS pumps


 

To update the WAS pump thermal overload,  please follow section 4.3 and 5 of the attached manual (also pasted below).

The  units being adjusted are inside the panel, typically in the bottom left, where  highlighted in yellow in the screenshot below.

 

Run the WAS pump for 60 minutes  and then set the overload as per the instructions.  (note, check whether you’re working in C or F so the adjustment can be done correctly;  see section 5.3).